Chapter 1578: The Lively Construction Site
In October, the Shangri-La community completed all the work of bulldozing the mountain, leveling the land, etc., and started digging the foundation.
A total of 50 square kilometers, 75,000 mu of land, all started to be built at once, it would be scary, and even more exhausting.
But the 30,000 mu of land built from the beginning is definitely not small, basically 100 times the area of a normal market.
More than 600,000 people are working on this huge construction site, and thousands of vehicles of various kinds come and go endlessly. The daily consumption of electricity, cement, river sand, steel bars, and even food, etc., is all astronomical.
Huge workers' simple houses, like yurts, are scattered everywhere on the vast land.
Anyone who comes to see this spectacular working scene will be extremely shocked.
Because it represents the power of labor and the power of people working together. This kind of power is very simple and not very good to say, but when you see such a large construction site busy together, you will definitely feel a surge of emotion.
In this area, a total of 8 large-scale real estate companies and more than 28 construction companies have gathered together to divide labor and cooperate in various matters.
Compared with Fairy Real Estate Rongcheng Branch, Xiao Qi is very serious about the construction of Shangri-La Community.
Although the houses here are mainly small houses, although the buildings here are relatively densely spaced, the price will be much cheaper than those in the capital, but this does not mean that the quality requirements can be relaxed.
From the beginning of the design, Xiao Qi invited experts from Japan, Hong Kong and Singapore. These three small places have very high floors, but the quality is very good, and the layout is relatively reasonable. So it is necessary to seek their opinion.
After jointly viewing the most detailed geological exploration results, a group of experts and designers drew two or three hundred plans during the three months from June to September, discussed them one by one, and finally came to the final conclusion. 12 kinds of building group schemes based on different regions that are reasonable, most stable and can best meet the needs. And convened the engineering management personnel to train for more than half a month, and then started to work.
At the beginning of December now, although the construction has only started for two months, due to the sufficient initial preparations, in addition to digging foundations and building reinforced concrete foundations, the progress of one floor per floor has been maintained in 12 days, and the residential building has been built. The speed is very slow, but each floor is very delicate.
"I have never seen such a waste of money, such a waste of manpower and material resources, such strict and meticulous steps before the start of construction. But after such a step by step, I have no doubts about whether Shangri-La will succeed. Shangri-La If the community is not successful, it’s too much for heaven!" - This is the most shocking feeling reported by the leader of the work team sent to the construction site by Yanzhao Province to the secretaries.
Since both Yanzhao Province and Xiannv Company have special inspection agencies on site, unfair incidents rarely occur. Those workers were informed of the phone number and address of the inspection agency on the first day they entered the construction site. The report is true. Then there is absolutely no second-guess treatment.
Zhou Bo is very painstaking in managing Xiaoyao Express, which suffers a lot of losses and has many affairs. He can't take care of the Shangri-La community. So the director's task was placed on Yu Shanshan.
Vice President Yu also has a lot of business of his own, and basically only goes to the Shangri-La Community once a month or two, and the several management personnel who are stationed in rotation are naturally from the General Affairs Department.
They don't know that it doesn't matter if they are tricky in real estate construction. There are more than 20 people from Shuchuan Architecture Institute who came with them. These people dare not say how proficient they are in architecture. But it is more than enough to find faults with Fang Zi and find some mistakes.
What's more, there are still more than a dozen Japanese and Singaporean experts here, and their task is to supervise all aspects of the building. These foreign experts are even less humane, they are only responsible for the high salary that Xiao Qi paid them.
Because of the area around Caojia Village and Xiangfu Town. They are all on the outskirts of Yanzhao, and between them and the capital, there are several large and small mountains that cover them. Unless tunnels and roads are repaired, this place is basically semi-closed.
The same is true in the future. Once the capital takes these two places into its pocket, road construction will begin immediately.
Once they are only a 30-minute drive from the same continent in the capital, the entire area will be included in the daily life circle of the capital, and housing prices will soar immediately.
After 2010, the high price here casually reached 10,000-15,000 per square meter, and after 2013, it soared to an astonishing average price of 20,000 per square meter!
The construction of two two-way six-lane roads, one leading to Tongzhou and the other leading to Shizhuang, was promised by Xiao Qi, and the construction had already begun as early as September.
Although the construction standard of the agreement is based on the service life of 15 years, the inspection team members of Yanzhao Province found that the standards and materials used by Renjiaxiannv Company are definitely better than the first-class expressway, and the speed is very fast.
In just three months, 10 kilometers of the 30-kilometer road leading to Tongzhou have been built. If it weren't for the fact that there are two tunnel roads to be built, various drilling and load-bearing problems have to be solved, the speed can still be Speed up a lot.
The road leading to Shizhuang has already been built for 25 kilometers. If calculated according to this time, even if the factor of difficult construction in winter is excluded, it will definitely be open to traffic by the end of next year.
If you want to get rich, build roads first.
The same is true now, if you want to sell a good house, then the transportation must be convenient.
After 2008 in the capital, housing prices will start a new round of soaring. By then, the Shangri-La community will definitely steal a large part of the light!
You know, Caojia Village and Xiangfu Town already have geographical advantages. It is at most an hour’s drive from China World Trade Center, and it is very convenient to transfer to Batong Line and Jingtong Line. Plugged into the Beijing-Tianjin Expressway, it is only two hours away from the city center of Jinwei. It is not a corner place that others don't want!
Xiao Qi couldn't believe it. I sold my two or three million houses. Can the housing prices in the entire capital and Jinwei rise to such an exaggerated level?
As long as the housing prices in the capital and Jinwei are suppressed, the overall benchmark will be lowered a lot, and the overall price increase effect will also be reduced a lot. In this way, it can be described as very satisfying! (to be continued..)