Xinghai Group's second-guarantee welding machines are still selling well. At present, ten production lines are in operation and production, with a lot of overtime, and the monthly production capacity reaches up to 60,000 units.

Originally, each second welding machine production line was designed according to 5,000 units per month, and the working hours were only calculated according to 9 hours per day. Of course, there must be some errors between the design of the design manual and the actual situation.

Before Xinghai Group entered the second-warranty welding machine industry, Tangshan Songshang sold tens of thousands of second-warranty welding machines every year, which was not as good as the monthly sales of Xinghai Group.

In January and February, sales of Tangshan Songshang Erbao welding machines continued to decline, only about one-fifth of the same period last year.

The sales situation of other international second-warranty welding machine manufacturers is also not optimistic, and only those that sell robot accessories, such as OTC, are slightly better than their international counterparts.

Domestic manufacturers are definitely much less affected by the Xinghai Group than international manufacturers. Customers should buy low-end equipment as usual. Anyway, they are not willing to spend more than ten thousand yuan, and they feel that they can basically meet the requirements.

In some companies, the demand for second-warranty welding machines is dozens of units. If all the second-warranty welding machines of Xinghai Group are replaced, nearly one million yuan will be invested at once, which is still reluctant to spend such extra money.

When he was free, Mu Yang came to the headquarters base to observe the progress of the IGBT arc welding inverter and argon tungsten arc welding equipment projects.

At present, the company is stepping up processing and manufacturing production line equipment, some of which are commissioned and customized, and are also stepping up manufacturing, most of which have not yet been brought to Xinghai Group.

The aluminum alloy factory is stepping up construction. After the Chinese New Year, Mu Yang went to inspect it and found that there was no major problem in the progress.

Today, Xinghai Group has three urgent projects in progress: IGBT arc welding inverter, aluminum alloy factory (aluminum alloy 6009, 6010, 7090), and argon tungsten arc welding equipment.

Other project teams, such as the titanium alloy project team, have independently developed other types of titanium alloy materials in addition to producing TC4 and TA7, so there is no need for Muyang to open and hang. Now there is no need for Muyang to worry about this project.

Today, the headquarters base has begun to increase its use.

The headquarters base has a total of 10 steel structure workshops, 5 frame structure workshops, and 10 laboratory buildings.

Due to the large number of workshops and laboratory buildings, in order to unify and standardize the naming of buildings and facilitate the identification of employees, the following regulations are specially followed:

According to the position of the headquarters base platform, the southwest corner is the origin of the coordinate system, the gate line of the base is the X axis, and the workshops are arranged in 5 columns and 3 rows, for example, X1Y1 is workshop No. 1, X2Y1 is workshop No. 2... X5Y1 is workshop No. 5; In the next row, X1Y2 is workshop No. 6, and so on.

The steel structure workshops are named No. 1 and No. 10 workshops, or steel 1 to steel 10; the smallest floor area is 10,000 square meters, and there is only one floor.

At present, the No. 1 workshop is a titanium alloy workshop, which has been put into use; the No. 2 workshop is an aluminum alloy equipment installation and debugging workshop. The equipment has been installed and is still being debugged. The progress is smooth, and it is expected to be officially put into mass production in April.

Frame structure workshops (reinforced concrete structures) have not been put into use for the time being. Most of them cover an area of ​​about 10,000 square meters and are 8 stories high. Most of the single floors are two stories high, about 8 meters. ;Named respectively as X1 to X5, or knot 1 to knot 10, X1 to X2 have been built.

The experimental building is not much different from the experimental building in the university, except that the appearance is more sci-fi. The number of floors ranges from five or six floors to more than a dozen floors. Currently, there are 10 experimental buildings planned to be built, and the area of ​​each building ranges from 2,500 square meters To more than 10,000 square meters, the total construction area of ​​the ten laboratory buildings is about 300,000 square meters.

The experimental buildings are named Real 1 to Real 10, and Real 1 has been put into use as a supercomputing experimental building.

Of course, a laboratory building has such a large space, and the supercomputer only occupies a part of it.

Since the end of February, the company has begun to relocate most of the machining equipment from the current group company.

The headquarters base is positioned as an experimental base, and only some non-polluting production and production with high confidentiality requirements will be deployed.

Most of the leftovers from the current headquarters are pollution issues, such as welding (including surfacing, secondary welding, argon tungsten arc welding, laser welding, etc.), grinding, and processes before and after welding such as heat treatment.

Xinghai Group's sandblasting/shot blasting and painting business has been outsourced for processing, and most of the outsourced factories are in the suburbs or neighboring cities.

As long as the steel plate or sheet metal parts such as the sheet metal shell of the secondary welding machine and the shell of the handheld laser welding machine are steel products, they need to be sandblasted/shot blasted and then painted, otherwise they are easy to rust.

[Sand blasting and rust removal: compressed air is used as the power to form a high-speed jet beam to spray sand particles (copper ore sand, quartz sand, corundum, iron sand, Hainan sand, generally steel sand grains, about a fraction of the size of rice grains) at high speed to the surface of the workpiece to be treated to remove rust]

Although painting is not as polluting as cement plants and power plants, after two years, City H still strictly controls machinery manufacturers and does not allow painting operations in the urban area.

The original company of Xinghai Group was not big. Once the paint was sprayed, the whole workshop smelled of paint, and the air was filled with formaldehyde. The employees working and living here would definitely be polluted.

Relocation of equipment is a troublesome matter, not to say that dismantling the equipment can be easily installed in the new workshop.

First of all, the layout of the workshop should be based on the general direction of logistics principles and the principles of human, machine, material, law and environment.

The detailed rules follow the 5S principle, such as warning line, unqualified product area line, channel line, positioning line and other lines.

Generally speaking, it is a layout based on the principles of standardization of safety management, rationalization of production processes, maximization of space utilization, and simplification of visual management.

The company has production line layout experts who are in charge of this area. They have drawn CAD drawings long ago, indicating what equipment is placed on the drawing, how to place it in the direction, and whether to lay a foundation.

Machine tools that require high precision have to re-dig holes and lay cement foundations. The equipment must be leveled before installation. It does not mean drilling holes and tightening nuts and bolts casually to fix the equipment.

On February 3, Mu Yang listened to Yang Hai's report on the group's sales situation.

In January, although it was a holiday on January 27, there were 5 days less classes in that month, and the revenue of the entire group was 1.7 billion yuan.

In February, I officially go to work on the ninth day of the lunar new year. The number of days in the month is relatively short, and the companies go to work relatively late, and the daily revenue is relatively poor.

After listening to the report, Mu Yang and Zhou Chen came to the headquarters base for inspection.

The two inspected the progress of the argon tungsten arc welding project.

Tungsten argon arc welding is different from two-welding welding, the former is non-melting electrode welding, and the latter is melting electrode welding.

The melting temperature of tungsten is very high, reaching 3390°C-3430°C, while that of steel is only a few hundred degrees Celsius.

Due to the high melting characteristics of tungsten, adding tungsten element to many alloy materials can increase the high temperature resistance.

Tungsten argon arc welding is abbreviated as TIG, also called argon arc welding. Xinghai Group's hot wire TIG automatic surfacing welding is also tungsten argon arc welding, but it is automatic, and it is automatic wire feeding.

The market capacity of TIG is not as large as that of the second welding machine, and the equipment is simpler, and it can also be used as an electrode manual welding equipment.

Like the videos of later generations, those fish scale welding videos mostly use TIG welding, and stainless steel is still welded to achieve a beautiful effect.

In the middle of the hall of the Xinghai Group, there is a one or two meter high eagle, which is made by Mu Yangweld.

Of course, with such a large volume, it is impossible to weld all of them, which would be exhausting.

He asked people to weld a frame first, then surfacing and grinding, and finally he did the surfacing.

Different current size, welding speed, interlayer temperature, gas purity, etc., the color of welding is not the same, silvery white, yellow, blue, gray and black means that the current is too large.

The two walked around and found that the argon tungsten arc welding project was progressing relatively quickly. After all, many production equipment and materials were similar to those of the second welding machine.

After the two finished walking, they came to Xinghai Building.

Nearly a year has passed, and the height of the main building of Xinghai Building has reached two to three hundred meters. It is estimated that by the end of the year, the main building will be completed and it will enter the decoration stage. If all goes well, it will be opened in the second half of next year.

In one or two years, Mu Yang didn't feel that far away, and when he got busy, time passed very quickly.

By that time, Song Xuelu had already graduated, and the two should be getting married.

In this life, he wants to have children earlier, how many?

It should be two anyway.

Well, most of them are twins.

Mu Yang stood in front of Xinghai Building, thinking beautifully.

Chapter 281/640
43.91%
Rebirth 2008: I Can Make Money ReadingCh.281/640 [43.91%]