Chapter 1544 Specifications
The real core area of every branch and R&D base of Jiuzhou Technology - the server room center.
Those who can enter this place, even Luo Jiang, the person in charge of the construction center, can only enter for a period of time.
And Liu Jun, the person in charge of the Shanghai branch, can only enter when he works in this position. If he is transferred back to the headquarters of Xinke District in the future, he will also lose the right to enter this area.
The data center is the beating heart of today's digital economy era, and the server room center is the core of this heart.
After entering the server room center, Luo Jiang, the person in charge of the construction center, his temperament suddenly changed.
Wearing black-framed glasses and slightly adjusting the collar and sleeves of his clothes, a person in charge of inspecting the construction site suddenly became a computer engineer who is over 35 years old.
Here, he didn't even need drawings and tablets, and he introduced very familiarly: "The place we are in now is just one of the command rooms. In order to effectively reduce the energy consumption and greenhouse gas emissions of the server room center, we integrated energy recycling and intelligent control technology into the overall design during design and construction, and the energy utilization efficiency is at the leading level in the industry.
The screen here shows the working status of the direct ventilation natural cooling system. The outdoor cold air is sent into the room after filtering, and is discharged from the pipes through the heat channel after heat exchange. Of course, in addition to various sensors in the pipes, there are also unit-level bionic robots that check at all times. Check the pipeline.
The screen on the left shows the medium-temperature chilled water system in the central facility area and office area of the server room. It mainly uses part of the groundwater and lake water for cooling to achieve some natural cooling, and the other part uses heat recovery technology to provide heating to the R&D area and office area in spring, autumn and winter. At the same time, it can also provide some special laboratories with 24-hour heat supply all year round, realizing waste heat recycling and reducing carbon emissions.
While introducing liquid cooling technology, special materials developed by the Titanium Star department are widely used here, which can further improve power density and cooling efficiency. In the power supply link, power semiconductors are widely used. The copper device is replaced by the body, which significantly reduces the power loss.
The screen in the upper right corner is the visual display screen of Xiezhi. According to the technical planning of the headquarters, we use AI intelligent technology to dispatch business, reduce peaks and fill valleys, balance the server load, and improve resource utilization.
Under the designed full load operation, the server room center is expected to save 2.03 billion kWh of electricity and reduce carbon emissions by about 1.45 million tons per year.
The planning layout is divided into five areas for construction. A total of 30 data centers, 6 220KV substations, laboratories, R&D and production industrial buildings, and employee canteens will be built. Dormitories and other supporting facilities for life services.
After all are completed, the installed capacity of servers will exceed 2 million units, the scale of super computing power will exceed 300P, and the scale of intelligent computing power will exceed 22,000P, becoming the largest cloud data center in the Yangtze River Delta region. Although there is still some gap compared with the headquarters, it is already the scale and performance of the integrated big data center cluster hub in the top five of Bluestar in the world.
Due to geographical reasons, the project did not enter the "East Data West Computing" project, so we have 100% control over the project. "
After listening to Luo Jiang's brief introduction, Liu Jun, who knew the general situation, couldn't help but take a deep breath and sighed.
He subconsciously lowered his head and looked at the floor.
He knew that under the floor that he couldn't see through, there were densely packed, neatly arranged server rooms like game modeling batch module buildings.
Gu Qing did not interrupt Luo Jiang's explanation, but he was also doing his own inspection work on the side.
Imprint your palm on a sensing area below the central large screen.
[Authentication successful, welcome, sir]
There is no position, let alone other special identity display.
Gu Qing was basically treated similarly when he demonstrated his intelligent system to the public.
After confirming his identity, Gu Qing said, "Xiezhi, turn on the office mode, scan your identity, and perform real-time modeling. Put the virtual modeling of the entire project on the operating table, and mark the abnormal and special parts.
Link to the Lingjing Ecological Server and apply for a one-hour virtual laboratory authorization."
[Office mode is turned on, real-time modeling is completed
The Lingjing Ecological Virtual Laboratory is providing technical support]
When these two lines of words were displayed on the big screen in front of them, everyone in the office subconsciously stepped back one or two steps, because on the central operating table in front of them, there was a virtual modeling formed by light, and there were also many special light and shadow examples in the space.
In the blue virtual light and shadow composition, there are various buildings above the ground, such as office buildings, swimming pools, fitness venues, canteens, and dormitory areas, as well as important facilities such as experimental bases, server room centers, energy supply hubs, and circulating water control systems below the ground.
And among these densely packed virtual models, there are some places flashing yellow spots from time to time.
When Luo Jiang, the person in charge of the construction center, saw the color of these light spots, his heart sank.
"Mr. Gu, we-"
"No need to explain, the yellow light spots are just hidden dangers, it does not mean that you cut corners. Design drawings are design drawings, and on-site construction is on-site construction. I know that these are actually two concepts. Even if we use intelligent robots for construction work, it cannot change the errors and some problems in actual construction.
And this technology has actually been updated and optimized. Problems that could not be found at that time are now found, which further proves that these problems are newly discovered.
For the drainage and water inlet of the swimming pool, the safety hazards show that the drainage needs an additional layer of filtration and disinfection, which basically maintains the same hygiene standards as the water inlet. This is optimization. '
There is also the air filtration system here, and some new equipment, which have only been developed and successfully tested during this period. These equipment were not available when you designed it.
I can't send you this modeling file, but I will let Xiezhi sort out the modified and optimized areas and equipment and send them to you.
The next construction time should be enough, right? It won't be a bit rushed, right? "
Hearing Gu Qing say this, Luo Jiang, the person in charge of the construction center, did not breathe a sigh of relief, but immediately closed his legs and said seriously: "There is enough time! We will definitely complete all the tasks arranged by the company on time! "
There is no explanation for any problems, nor does he try to cover up. This 40-year-old doctor is like a sergeant who is about to go to the battlefield, and his voice is not trembling at all.