Rebirth of the Super Banking System

Chapter 2000 The Rest Is to Do (Please Subscribe!)

Not difficult to understand.

higher.

The more people that can be stuffed into it, the more area that can be sold. You must know that the land in Loy City is actually almost the same as if you don’t need money.

Around.

There are not many people, even if there are, it is almost negligible if it is spread over the entire project. In this case, of course, the higher the higher.

"Is it very high?" Mi Hao asked again.

"Do not."

Shaking his head opposite.

"The Indian side wanted to, but it was rejected by the Bank of Myanmar Group. In fact, most of the buildings were raised by less than 20%, and they were still low."

"but."

"But another compromise has been formed, that is, in some places, making larger concessions, such as adding some large and dense communities, can be very crowded."

"thus."

"It is considered that the requirements of both parties have been taken into account."

After listening.

Mi Hao nodded.

Too.

The projects undertaken by the Myanmar-Asia Bank Group have always been very demanding and principled.

One to look good.

One to sell more.

it is good.

Then I will plan some large-scale communities for you, and the other places are still the original standard, so that it will not destroy the overall beauty of Loy City too much.

and.

With the 'high standard aesthetics' of the Myanmar Bank Group, even these high-rise buildings should be able to make up for their shortcomings with excellent design.

Um.

it is good.

The rest is to do.

Following such a Party A, or a representative of Party A, Mi Hao can be said to be extremely comfortable, and he is afraid that Party A will grind everything he does.

Also like to change three times a day.

Which is like now.

Just over half a month.

-

Fundraising.

-

planning.

-

design.

-

map.

-

tender.

It's done, it's not only fast, and it's not taking the initiative to ask for financing, just sit at home, open the door, and someone will send money.

Simply.

How many developers want to cry and faint in the toilet, and want to hit the wall with envy.

"correct."

"How long can I start working?"

"Six One."

"what?"

"Six One."

Mi Hao: "..."

six one.

What's the number today? On May 25th, it is equivalent to saying that there are only six days, six days, to pass the review of the relevant construction department in India.

Obtain various licenses.

Boss.

Are you kidding?

At first.

Even for urban loans in India, there is a lot of preparation time. When they entered the construction site, more than half a month had passed since the bidding time.

now.

The amount of work has multiplied many times, and the time is less.

now.

Just listen to the opposite:

"Hehe, don't be surprised, this time there is a lot of capital involved. There is so much capital that they are able to do a lot of things together, so it's not surprising."

"Too."

Mi Hao nodded.

After chatting for a while, hung up the phone.

This time.

You don't have to go to Africa.

it is good.

Moreover, such a large project also has a lot of bonuses. It is said that the bonuses given to the previous projects exceeded his one-year salary, more than that.

this time.

The contract has nearly tripled.

Done.

As a project manager, at least I can get more than one million bonuses.

Delicious.

. . .

the next day.

The headquarters asked people to send over the drawings.

"..."

Generally, there are at least a dozen drawings for a house, ranging from architectural planning to the most detailed list of materials, drawings of a block, directly on the ton.

And in front of.

Sixteen blocks.

All right.

The archives are almost full. Looking at it makes people dizzy, Mi Hao's mouth twitches, he really doubts, is this what a human can do?

How long.

This is still 16 blocks. The entire city of Loy is very big, needless to say, it is very large. It takes more than a dozen vans to pull the drawings.

Such a design task, under the limited time conditions, is more difficult than hell. However, it doesn't matter who designed it and how it was designed.

The important thing is - build.

"call!"

Take a deep breath and take a master plan.

meeting.

"We can see that this project is distributed in four directions: east, south, west, and north, and some are connected, so there are six connected areas in total."

"Each area, one project department."

"this time."

"Because of the huge amount of work, the company will send three additional deputy managers. According to the plan, the construction will start on June 1st, and related packages will arrive in the next few days."

"..."

He is more bull.

Don't care about so many areas.

therefore.

He added two more subordinates to him. After all, every block was filled with hundreds of buildings, like a hill of blueprints, running back and forth too far.

"Recently."

"Everyone is familiar with the drawings and formulates the construction plan. Once the construction starts, the progress will not wait for anyone. Although the amount of work this time is large, I believe you have experience."

"Anyway."

"The process, the procedure, must be planned reasonably."

"The equipment, personnel, and the head office will assist in the allocation. This time the project is large and the demand for materials is also large. Langyu County has allocated a piece of land in the south."

"Material transfer specifically for this project."

"..."

two hours later.

At the end of the meeting, Mi Hao couldn't do anything either. There were too many things to do. That's how engineering works.

Fortunately.

Exhausted, not afraid of default.

otherwise,

After a year of hard work, if you can't get money, then you will be troubled.

. . .

After the meeting.

boarding.

to the India-Myanmar border.

now.

It's almost the same as when he came here. I saw a large number of construction vehicles queuing up. Those who came back from work before have to go there again, and they are busy now.

June 1 is the construction time.

What do you mean?

It means that the house can be built, and before building the house, there is still a task, that is, three connections and one leveling, water, electricity, and road access.

and the ground level.

otherwise.

He would not be surprised that the construction started on June 1. After obtaining the land, the three links and one leveling can be fixed by themselves, but to build a house, various documents are required.

Review drawings.

Audit capital.

A picture of a dozen trucks, even if the construction and other departments of the state of India are all dispatched together, Mi Hao estimates that a month is enough, and now it only takes a few days.

Seeing it over there, it is estimated that the first reaction is: Can I give up?

After passing the card.

I saw dust flying in some places. That was when the land was leveled. The land here is relatively level, but it is much simpler. As for the three links.

Also simple.

dig a hole.

Buried.

All in one go.

As for water, I use Roy City’s. Electricity is also mature. There are two power plants, one for the main and the other for the backup.

completely satisfied.

and.

The water and electricity pipelines do not run around the entire area, but surround them to supply the construction needs of those main electricity and water.

such as concrete mixing.

It is located directly on the edge of the city. At the beginning of the construction, the electricity consumption of each block is very small, and most of it is all kinds of machinery oil.

excavator.

Crane etc.

As for the project department, there is solar energy.

According to the general process, when they dig pits, the construction of underground works such as pipes and canals takes the lead. Therefore, when a large amount of electricity is used, there will be electricity.

Chapter 2001/2406
83.17%
Rebirth of the Super Banking SystemCh.2001/2406 [83.17%]